These guides exist so a bid can be read against something other than the last bid. Every rate is in Canadian dollars, dated August 2026, and tied to a named source: a GTA contractor's published pricing, a municipal unit-price estimate, or a published Canadian cost guide. Where sources disagreed the range was widened rather than one picked. None of it is a quotation for your site, and 13% HST sits on top unless a row says otherwise.

Which cost guide do you need?

9 researched rate guides for the Greater Toronto Area, each with a full source-cited table, the Ontario rules that move the price, and the questions that decide whether two bids are comparable.

Comparing two options?

Head-to-head breakdowns of the scope decisions that split two bids on the same lot: what each option fixes, what neither fixes, and what the bid has to show either way.

Frequently asked questions

Are these rates current, and where do they come from?

Every figure comes from a named Canadian source: a GTA contractor's own published pricing, a municipal unit-price cost estimate from the City of Toronto or the Region of Peel, or a published Canadian cost guide. Where sources disagreed, the range was widened rather than one picked, and every number is attributed inline and again in a sources list on each guide.

Is HST included in these rates?

No, unless a row says otherwise. Ontario charges 13% HST and most contractor price lists quote before tax, which on a $50,000 lot program is a $6,500 swing. Confirm in writing whether each bid is tax-in or tax-extra before you put two of them side by side.

Can I price a lot from these numbers?

No, and nothing here should be used that way. These are regional benchmarks for reading a bid, not a quotation for your site. A small scope can land on a mobilization minimum rather than a unit rate, subgrade condition is unknown until the surface comes off, and access and phasing on a tenanted site move the total. Use the ranges to spot a bid that is far outside them, then ask why.

Why do some guides lean on municipal cost estimates?

Because for some scopes there is no published commercial rate card at all. Excavation, catch basins and private roadway work are quoted after a site visit almost everywhere, so the honest benchmarks are real municipal road-project estimates, which are public and itemized. Each guide says plainly where its figures came from and what that means for a private site.