Mill and pave is the default on a lot that still drains and where curbs, thresholds and catch basin rims are already at the right height. An overlay is faster and lighter on disruption but adds thickness, so it only works where there is room to raise the surface. Neither one fixes a base failure, and any bid that skips that question is not comparable.

Once the approach is settled, AsphaltPavingIndex's own dataset lists 181 asphalt paving contractors across the Greater Toronto Area at an average Google rating of 4.27★ over 7,031 reviews (August 2026), so you can move straight from this page to a ranked shortlist for the bid list.

This page compares the two approaches on scope, evidence and disruption. Rates live in the linked cost guides, where every figure carries the named source it came from.

Mill and pave or Overlay: what actually separates the two on a lot?

AsphaltPavingIndex built this side-by-side around the things that decide the choice on a working site: what each approach does, what it leaves untouched, and what the bid has to show before two prices can be compared at all.

Mill and pave vs Overlay on a Greater Toronto Area commercial site, reviewed August 2026. Rates are on the linked cost guides, quoted before 13% HST.
CriterionMill and paveOverlay
What the crew actually doesGrinds off the top of the existing mat to a specified depth, sweeps, then places new asphalt back to the original elevationCleans and tack coats the existing surface, then places new asphalt on top of it
Effect on grades and elevationsElevations stay as found, so curb reveal, door thresholds and accessible routes are unchangedThe whole surface rises by the thickness of the new lift, cutting curb reveal and thresholds
Drainage structuresCatch basin and manhole rims usually stay at grade, so fewer structures need adjustingRims end up low unless each structure is raised, which is a separate line item
What it fixesSurface cracking, ruts and a worn mat, while keeping the profile that already drainsA tired but sound surface where nothing about the profile needs to change
What it does not fixBase failure, soft subgrade, or a lot that ponds because it was graded wrongThe same, plus cracks that reflect straight back up through the new lift
Reflective cracking riskLower, because the cracked layer is removed rather than coveredHigher, since existing cracks telegraph through unless treated first
Site disruptionTwo operations, milling then paving, so a section is out of service longerOne operation, so sections come back into service sooner
Recycling of the old surfaceMillings are removed and recycled; confirm who owns haulage and disposalNothing is removed, so no disposal line at all
What the bid must showMilling depth, disposal, structure adjustments, mix type, compacted lift thickness, and a unit rate for base repair found once the surface is offCrack treatment before paving, tack coat, compacted lift thickness, and which structures are being raised

Which surfaces call for milling before paving?

Mill before paving when the lot already sits at the elevations it needs. Grinding the old mat off means curb face, door thresholds, accessible routes and catch basin rims all stay where they are, and the cracked layer leaves the site instead of sitting under a new one.

  • Curb reveal is already tight, or there are doors, thresholds or accessible routes the surface cannot rise into.
  • The lot drains the way it should and the profile is worth preserving.
  • The existing surface is cracked enough that covering it would reflect straight back through.

And which call for an overlay?

Overlay when the surface is worn but sound, the profile still drains, and there is physical room to raise it. It is one operation rather than two, so sections come back into service faster, which matters on a lot that cannot be closed for long.

  • There is room to add thickness without burying curb face, thresholds or inlets.
  • Cracking is limited enough to be treated before the new lift goes down.
  • Keeping the lot in service is the binding constraint and the profile is not the problem.

How does the choice play out on a working site?

Take a tenanted plaza lot where the surface is failing but the grades are correct. Here is how the two approaches differ where it counts on a working site:

Reading the site
Finished surface elevation
Unchanged vs raised by one lift
Structures needing adjustment
Few vs each rim in the paved area
Operations per phase
Two (mill, then pave) vs one
Old material leaving site
Millings hauled vs nothing removed
Question that decides it
Is there room to raise the surface?

If the answer to that last question is no, the choice is already made and the overlay bid is not really comparable. If there is room, the trade is fewer days out of service against a surface that rises and cracks that can reflect through. Ask both bidders to state, in writing, what happens to the price if failed base is found once work starts.

Frequently asked questions

Is milling always necessary before repaving a parking lot?

No. Milling earns its place when elevations matter or when the existing mat is cracked enough that covering it would reflect through. On a lot with generous curb reveal, a sound surface and no threshold conflicts, an overlay does the job with less disruption. The deciding question is whether the surface can rise without burying curb face, door thresholds, accessible routes or drainage inlets.

Will an overlay hide the cracks in our lot for good?

Not by itself. Cracks in the layer underneath tend to telegraph up through a new lift, which is why crack treatment before paving is a line item worth checking in the bid. If the cracking is extensive, or it is the alligator pattern that signals base failure, neither an overlay nor milling addresses the cause. That is a full-depth repair question, not a surfacing one.

What does milling do to our catch basins and manholes?

Usually less than an overlay does. Because milling puts the finished surface back near its original elevation, most rims stay close to grade. An overlay raises the surface, so every structure in the paved area sits low unless it is adjusted, and each adjustment is its own line. Ask each bidder to list which structures they are adjusting and which they are leaving.

How do we compare a mill-and-pave bid to an overlay bid fairly?

Put them side by side on exclusions rather than headline rate. Confirm milling depth and who owns haulage and disposal, the mix and compacted lift thickness, which drainage structures are being adjusted, how the site is phased, and the unit rate that applies if failed base turns up once the surface is off. Two bids that differ on any of those are not pricing the same job.

Questions to ask your contractor

  • Is this an overlay on the existing surface or a full-depth removal, and why? What each approach costs
  • What tack coat, mix type and compaction are specified, and who tests them?
  • How long before the new surface takes traffic, and what protects it meanwhile?
  • What is the unit rate if failed base is found once the surface comes off?
  • Which items are excluded from this price, in writing?